The focus these last few weeks has been on mechanical and electrical work, insulation, and most recently, the installation of the glazing (windows). With the onset of colder weather, the construction crew will be very glad to have the building sealed, and some heat turned on inside!
The photos below were taken last week:
Glazing at the main entry to the library - very bright and welcoming
The clerestory windows beneath the roof line, bringing in plenty of natural light to the second floor
The beautiful big windows in the children's area
Windows on the exterior wall of the multipurpose/meeting room - what a nice change this will be!
A view of the western side of the building, showing the glazing on the second floor. When the long orange tarp is removed, the dramatic two-storey glazing in the main stair area will be revealed!